Commissioning & First-Start Support
Completion checks, systemisation, punch-list closure, pre-commissioning, energisation, first start, testing and handover.
Freelance commissioning specialist
More than 15 years of direct international oil and energy experience across commissioning, start-up, fired equipment, hydrogen and gas processing, E&I, controls and technical training.
Open to selected international assignments, including commissioning leadership within established professional scope.
Completion checks, systemisation, punch-list closure, pre-commissioning, energisation, first start, testing and handover.
Burners, pilots, draft, fuel/air balance, flame stability, BMS permissives and controlled recovery trials.
FAT/SAT support, loop and logic checks, cause-and-effect verification, interlocks, trips, valves and field instrumentation.
Training built around the client’s real plant, equipment, control philosophy, procedures and operating problems.
Readiness and start-up through coached operation, competency development and documentation handover.
Role-specific refresher, abnormal-condition, troubleshooting and requalification experience.
Technical coordination among equipment vendors, contractors, owners and site teams.
Fired-heater troubleshooting support for a hydrogen and carbon-monoxide production facility in Texas.
Commissioned, started and troubleshot a hot-oil heater during a renewable-diesel system upgrade in Singapore.
Commissioned and troubleshot a DEG regeneration and reboiler package, including PLC/HMI, instrumentation and BMS validation.
Incinerator package commissioning, logic checks, operator training, testing and optimisation in Angola.
Supported construction completion, instrumentation, commissioning and start-up across hydrogen, sulfur-recovery, utility and process systems.
Training is tailored to the client’s actual equipment, process configuration, control philosophy, operating procedures and real operating problems. It can be delivered to field operators, panel or DCS operators, and maintenance crews as initial training, refresher training, troubleshooting training, start-up preparation, or part of a commissioning package.
The objective is not to memorise isolated steps. Personnel learn the big picture: how systems interact, what changes during abnormal conditions, the consequences of actions, and why each procedure exists.
More than 15 years across 49 countries on six continents, covering refining, petrochemicals, hydrogen, gas processing, utilities, offshore facilities and fired equipment.
Prepared to apply established commissioning experience in data centres, nuclear, subsea and infrastructure projects. These are sectors Bojan is ready to enter, not sectors in which he claims previous lead-project experience.
The interactive site contains the complete project history, locations and supporting field experience, including a 2026 Puma Energy / ICE burner-system site-readiness and pre-commissioning visit in Managua, Nicaragua.
Organisations, contractors, vendors and technologies encountered through project assignments. Inclusion does not imply a current affiliation or endorsement.
Email boyan@borhez.org or connect on LinkedIn.